General Training Air conditioning - Module 5 Charging,

Read or Download General Training Air conditioning - Module 5 Charging, Recovery, Recycling and Reclamation PDF

Similar technique books

IL-1 Receptor Type I

The IL-1 receptor style I is the ligand-binding chain of the IL-1 heterodimer advanced. it's a three-domain Ig-like extracellular receptor with a cytoplasmic area containing the Toll protein-like sequences. The IL-1 R variety I doesn't functionality with out the second one chain of the dimer, specifically the IL-1R accent protein.

17th Edition IEE Wiring Regulations: Inspection, Testing and Certification, Sixth Edition (IEE Wiring Regulations, 17th edition)

This renowned consultant clarifies the necessities for inspection and trying out, explaining in transparent language these elements of the Regs that almost all want simplifying. as well as the standard descriptive and diagrammatic try out equipment which are required, factors of the idea and reasoning in the back of attempt strategies are given, including helpful tables for try out effects comparability.

Engineering and Environmental Challenges (Compass Series (Washington, D.C.).)

Record from the nationwide Academy of Engineering Annual assembly, held October 24, 2000. Discusses the engineering and environmental demanding situations on the earth platforms engineering. Softcover.

Additional resources for General Training Air conditioning - Module 5 Charging, Recovery, Recycling and Reclamation

Example text

While the steel and coating may be capable of withstanding higher temperatures, it will come in contact with insulating materials with limited temperature capabilities. In larger units, cooling ducts are used inside the core for additional convective surface area, and sections of laminations may be split to reduce localized losses. The core is held together by, but insulated from, mechanical structures and is grounded to a single point in order to dissipate electrostatic buildup. The core ground location is usually some readily accessible point inside the tank, but it can also be brought through a bushing on the tank wall or top for external access.

Jefferson City, MO. 2 Vacuum Processing With the coil still warm from the bonding process, transformers are held at a high vacuum while oil flows into the tank. The combination of heat and vacuum assures that all moisture and all air bubbles have been removed from the coil, providing electrical integrity and a long service life. Factory processing with heat and vacuum is impossible to duplicate in the field or in most service facilities. Transformers, if opened, should be exposed to the atmosphere for minimal amounts of time, and oil levels should never be taken down below the tops of the coils.

For single-phase applications, the windings are typically divided on both core legs as shown. 4. 3 Schematic of single-phase core-form construction. 4 Schematic of three-phase core-form construction. 5 “E”-assembly, prior to addition of coils and insertion of top yoke. constructed separate of the core and placed on their respective core legs during core assembly. 5 shows what is referred to as the “E”-assembly of a three-phase core-form core during assembly. In shell-form construction, the core provides multiple paths for the magnetic circuit.

Download PDF sample

Rated 4.73 of 5 – based on 13 votes